top of page
2BRX682_Cropped_edited_edited_edited.jpg

An Extraordinary Journey Starts Spring 2025:
Participate in Designing a New V
illage
Inspired by Historic England

Proposed: Cottages, Workplaces, a Village Green & Chapel
Built with Modern English Architecture & AlongWalkable Streets

Photo: Snowshills, England

Design

2025

Phases

Construction

2026

Nestled Within 50 Acres of Pine Forest,
St. John's Woods will be Modeled After Historic European Towns

  • A village green and chapel with the Blessed Sacrament

  • A mixture of homes, offices and workshops

  • Car-free streets and squares designed for people

  • Traditional architecture updated for modern tastes

St John's Woods Map.jpg

Participate & Influence the
Design of the Master Plan

A collaborative planning and design process will guide the development of the site plan and architecture.
Join us over the spring of 2025 as we hold one on one interviews,  public forums and presentations. Your feedback will then be implemented in the Master Plan designed by the architectural team. 

Screenshot 2024-04-05 180243.png

The Design Process

(We Need Your Input!)

01

Discussions & Interviews

Every element, from the site plan to the architecture and building layouts, will flow from discussions with the community. This includes one on one meetings, group forums and surveys. The result will be an outcome based list of needs that will in turn instruct the design elements for the project.

02

Master Plan & Arch. Design

Referencing the design elements from step one, urban designers will create multiple master plans for presentation in a series of public meetings and feedback sessions.  The best elements will be synthesized into a final design.

03

Engineering Drawings

Once the master plan and architectural style are finalized, technical drawings will be created by local civil engineers and architects. Along with these items, a utility and storm water retention plan will be created for review and approval by the county.

04

Construction

After technical drawings are ready, construction will start, including roads, utilities and the initial buildings. Construction is planned to include 3 to 5 homes/businesses and will increase to 7 to 10 per year as the project progresses.

A One Time Chance to Participate Spring 2025

bottom of page